March 8, 2022:
March 3: Thank you to our volunteers!
February 18, 2022: The elevator passes inspection!
February 8: The new islands being constructed.
February 3, 2022:
January 24, 2022: The altar area getting a fresh coat of paint.
January 20, 2022: Installing the ceiling above the new upper windows.
January 13 & 14, 2022: Painting sanctuary and fellowship area.
January 4, 2022: The interior walls of the elevator being installed. There will be plenty of room to transport people and even tables if needed, between the two floors.
December 21, 2021
December 17, 2021: The elevator platform goes up and down :)
December 15, 2021: Almost all exterior windows are installed.
The drywall is nearing completion.
December 13, 2021: The elevator has arrived! Installation has begun.
December 10, 2021: The insulation is in and the drywall is almost completed.
November 10, 2021: Windows starting to be installed. Work on the altar has begun. The steps will be modified and new flooring installed.
October 20, 2021: New concrete
September 9, 2021: It’s a busy morning.
August 31, 2021: The concrete floor and stairs are in.
August 20 and 25, 2021: Our first wall on the east side.
August 18, 2021: The addition as seen from the west side and the new stair configuration. The stairs will change from a “U” shape to an “L” shape.
August 11, 2021
August 10, 2021: The elevator taking shape
July 28, 2021: Spancrete floor going in.
July 19, 2021: Making progress
There will be a window and a door facing west on the lower level.
July 2, 2021: Elevator shaft beginning
July 2, 2021: Prepping inside for construction. Thank you to the many volunteers!
June 30, 2021: The elevator pit
June 16, 2021
June 15, 2021
June 14, 2021: Digging begins. Moving three trees to a new location
June 11, 2021
June 9 & 10, 2021: Work continues
June 8, 2021: The block being removed from the north side of the building.
June 6, 2021: Groundbreaking ceremony
May 12, 2021: Getting closer to breaking ground.
March 11, 2021: Contract signing with Advanced Building Corporation. Thank you to our elevator/building committee for all their hard work.